Example forecast · wf-north-07 · 120 MW windExample
04080120160MW-12hNow+12h+24h+36h+48h
P10 to P90P50Realized
P50 at +6 h112.4 MW
P10–P90 at +6 h101–124 MW
Next gate closure14:45 CET
Illustrative values, not a real site. Real forecasts carry their run time, model version and calibration window.

Renewable forecasting and grid balancing

Read the weather before it reads your P&L

Helivane downscales GPU AI weather to each turbine and panel, forecasts power with honest uncertainty, and turns it into bids and battery schedules inside the limits you set.

Helivane is pre-launch. Send us one site and the team prepares an illustrative sample forecast for it after we reply.

Design targets

What we are building toward

These are the targets the pilot program measures against. They are goals, not results.

Forecast refresh60s

Design target for intraday data refresh per asset.

Horizon15 min–72h

Intraday through day-after-tomorrow, one model chain.

QuantilesP10–P90

Calibrated bands on every step, not a single number.

Pilot length12weeks

From data connection to decision shadowing.

The problem

Variable output, fixed penalties

Every renewable operator promises the grid a schedule. When the weather moves and output misses it, the imbalance bill arrives, and wrong dispatch means curtailed clean energy.

Imbalance

Coarse forecasts miss local weather

A continental weather grid cannot see the ridge, the wake behind turbine 14 or fog over one solar field. The miss is settled every 15 minutes.

Curtailment

Dispatch decided on a single number

A point forecast gives no sense of risk, so desks over-hedge or over-commit and storage sits idle when it should be charging.

Manual bridge

Forecasts stop before the decision

Traders and dispatchers turn numbers into bids by hand in windows that close in minutes. Value leaks at every gate closure.

How it works

Four steps from your data to a decision

  1. Week 1–2

    Connect

    Read-only links to SCADA history, metering and market data. No control access is needed to start.

  2. Every run

    Downscale

    Ensemble AI weather is downscaled to each asset with physics-ML that knows its terrain, hub height and layout.

  3. Every refresh

    Forecast

    A calibrated power model outputs P10, P50 and P90 per asset and per portfolio, from 15 minutes to 72 hours.

  4. Each market window

    Decide

    Dispatra proposes bids and setpoints with a stated reason. You approve, or let it act within bounds you set.

Technology

GPU weather and physics-ML, end to end

The ensemble is wide and the downscaling is physical, and both need accelerated compute to finish inside a market window.

NVIDIA Earth-2Ensemble AI weather and km-scale downscaling
NVIDIA ModulusPhysics-ML surrogates for terrain, wakes, irradiance and cells
RAPIDSGPU processing of SCADA and geospatial time series
cuOptStochastic scheduling and fleet optimization
NeMo and GuardrailsThe dispatch agent, its rationales and its limits
Triton, TensorRT and NIMLow-latency serving across many assets
OmniverseThe portfolio digital twin
Jetson and HoloscanEdge inference and sensor streams at the site
CosmosSynthetic extreme-weather scenarios
forecast.sh
# P10/P50/P90 power for one site, next 48 hours, 15-minute steps
curl "https://api.helivane.com/v1/sites/wf-north-07/forecast?horizon=48h&step=15m&quantiles=10,50,90" \
  -H "Authorization: Bearer $HELIVANE_TOKEN"

# Response (abridged, example values)
{
  "site": "wf-north-07", "capacity_mw": 120,
  "run": "2026-11-03T12:00Z", "model": "skycast-ds-0.4",
  "steps": [
    { "t": "2026-11-03T18:00Z", "p10": 101.2, "p50": 112.4, "p90": 123.9 },
    { "t": "2026-11-03T18:15Z", "p10": 99.8,  "p50": 111.6, "p90": 124.3 }
  ]
}

For developers

One API for forecasts and decisions

Pull quantile forecasts per site or portfolio, subscribe to new runs, and send decisions to your EMS or trading system. CSV and Parquet exports cover teams without an API client.

  • REST and webhooks, versioned and documented
  • Every value carries its run time and model version
  • Read-only scopes for analysts and auditors

Questions

Common questions

Is Helivane available today?

Not yet. Helivane is pre-launch. We are working with a small number of design partners on 12-week pilots that start in 2027.

Do you replace our current forecast vendor?

Not on day one. Pilots run in shadow next to your current forecasts, so you can compare skill and cost on your own sites before changing anything.

Do you need control of our assets?

No. Forecasting needs read-only data. Decisions start as recommendations, and any automatic action needs limits you approve first.

Which markets do you support?

We are designing for European day-ahead, intraday and balancing markets with 15-minute settlement first. Other markets are on the roadmap and depend on design partners.

Run Helivane in shadow on your own sites

We backtest on your history, then forecast live next to your current setup for 12 weeks. You keep the results either way.